Road Corporation Bukyeong Headquarters improves driving experience and toll gate congestion on express roads 관리자 2023.10.27 |
|
Road Corporation Bukyeong Headquarters improves driving experience and toll gate congestion on express roads Road Corporation Bukyeong Headquarters improves driving experience and toll gate congestion on express roads [Metro Newspaper] The Busan-Gyeongnam headquarters of the Korea Expressway Corporation is speeding up efforts to improve highway driving experience and toll gate congestion. The total length of highways in the Busan-Gyeongnam region is 669 km, ranking first in the country, and traffic volume is second in the country after the metropolitan area. In addition, due to the nature of the route with many trucks, there is a lot of road damage, so more time and budget are being invested in maintenance. Among the highways in the Busan-Gyeongnam region, some sections of the Namhae Line and Tongyeong-Daejeon Line have been built nearly 30 years ago, and inconveniences continue to arise for vehicles using them. Accordingly, the Bukyung Headquarters of the Korea Expressway Corporation will manage the road surface through intensive repair of 25km of the Namhae Line (Hadong IC ~ Chukdong IC), 22km of the Tongyeong-Daejeon Line (Sancheong IC ~ Jigok IC), and sections with poor pavement conditions (40 locations, 22.8km) in 2023. is doing In addition, starting in 2024, 25 km of the Namhae Line (Hadong IC ~ Chukdong IC) and 22 km of the Tongyeong Daejeon Line (Sancheong IC ~ Jigok IC) are planned to be completely resurfaced by spending more than 50 billion won. Currently, 9 out of 10 vehicles using the highway use Hi-Pass. As a result, there are cases where the high-pass lanes are blocked, but Dogong Busan-Gyeongnam headquarters is carrying out multi-lane high-pass construction to increase the existing one-lane high-pass to two lanes or more, starting with the Seobusan toll gate in 2014, to allow vehicles to pass quickly through the toll gate. is being promoted. Among the 69 highway toll gates in the Busan and Gyeongnam regions, 15 have multi-lane high-pass installations. Currently, construction is underway to install a multi-lane high pass at the Seoulsan toll gate, and when the construction is completed in December of this year, it is expected that vehicles using the Seoulsan toll gate will be able to use the toll gate faster and without congestion. It was announced that multi-lane high passes will be installed sequentially, including at the Bukchangwon and Goseong toll gates in 2024 and at the Dong Gimhae toll gates in 2025. An official from the Korea Expressway Corporation's Busan-Gyeongnam headquarters said, "Many employees are working hard on overall maintenance work, such as highway disaster prevention and quality control, so that customers can use the highway safely and comfortably," and also advised users to "prohibit overloading, tie down loading boxes, etc." “Please actively cooperate with highway safety,” he said.
Source : https://metroseoul.co.kr/article/20231026500436 |