BART(San Francisco) Fare Gates to avoid fare evasion

Key Facts

Industry
e-Payment
Region
San Francisco, America
Product
Fare Gates
Solution
Automatic Fare Collection

Introduction

-The new fare gates to be installed across all BART stations will feature an improved design and enhanced user experience. They will utilize the latest technology to reduce fare evasion, improve accessibility for wheelchair users, passengers with bicycles, and those using strollers, while also increasing the reliability and maintenance efficiency of the fare gates.

 

-The first prototype gate was launched into service at West Oakland Station in December 2023, and all 50 stations are expected to be completed by the end of 2025.

 

BART의 West Oakland 역사에 설치된 Fare Gate.jpg

 

Civic Center (M40)_1.jpg

 

Cvic Center (M40)_2.jpg

Benefits

• Creating a Safer Environment and Increasing Ridership: Equipped with tall and sturdy swing barriers to prevent fare evasion. 
• Enhancing Customer Experience: Advanced sensors facilitate easy passage for passengers with wheelchairs, strollers, or bicycles, while LED lighting assists visually impaired passengers.
• Improving System Reliability and Reducing Downtime: Easier maintenance increases system stability and uptime.
• Strengthening Monitoring Capabilities: Features sensors that detect fare evasion, enabling better enforcement and real-time monitoring.
• Modern Design: Contributes to transforming the atmosphere of BART stations into a 21st-century style.
• Reducing Conflicts Between BPD and Passengers: Secure fare gates encourage passengers to pay fares independently, minimizing unnecessary conflicts between fare evaders and police.
• New Payment Options: Compatible with next-generation Clipper cards and supports payments via credit/debit cards, Apple Pay, or Google Pay for effortless fare transactions. 

Solution

Straffic implemented state-of-the-art fare gates equipped with AFC technology, ensuring smooth transactions and interoperability with central ticketing systems. The deployment was meticulously planned to minimize disruption to daily metro operations and enhance passenger convenience.

 

Introduction of New Fare Gates:

  • Applied 2.6m tall iron gates and reinforced glass doors for enhanced security.

  • Incorporated First Opening Force technology (800 turns/approx. 600kgf) to prevent fare evasion.

  • Enhanced security and durability to address weaknesses in the existing system.

 

Reduction in Maintenance Costs:

  • Proposed a more efficient and robust system compared to existing U.S. solutions.

  • Simultaneously improved system stability and maintenance efficiency.

 

Prevention of Fare Evasion:

  • Designed with strong physical barriers to block illegal access attempts.

  • Observed a decrease in fare evasion rates and an improvement in BART’s financial stability after installation.

 

Application of Advanced Technology:

  • Structured to prevent fare evaders from jumping over or crawling under the gates.

  • Offers ease of maintenance along with high reliability and security.

 

Technological Advantage in Global Competition:

  • Outperformed major U.S. competitor Cubic with superior technology, becoming the final supplier.

BART GATE 테스트 장면 (1).jpg

 

BART GATE 테스트 장면 (2).jpg

 

BART에서 GATE 테스트하는 장면3.png

Result

The fare gate installation has successfully optimized fare collection, improved passenger accessibility, and streamlined metro operations. The solution has enhanced security and efficiency while providing a better commuting experience for passengers.

 

Reduction in Fare Evasion and Improvement in Financial Stability:

  • A noticeable decrease in fare evasion cases after the introduction of new fare gates.

  • The reduction in fare evasion has improved BART's financial stability.

  • Enables more investments in the long term.

 

Successful Entry and Strengthened Presence in the U.S. AFC Market:

  • Successful acquisition of the San Francisco BART project worth $47 million.

  • Completion of the 2019 Washington DC WMATA project worth $40 million.

  • Achieved over $100 million in total U.S. AFC-related business contracts so far.

  • Currently negotiating additional contracts with New York MTA and LA Metro.

 

Proven Global Competitiveness:

  • Secured the BART new fare gate project, surpassing U.S. giant Cubic with superior technology.

  • Engaged in global projects across Bangladesh, France, Spain, and India.

  • Demonstrated the competitiveness of Korean transportation technology in the global market.

 

Successful Implementation of the New Fare Gate System:

  • Replaced more than 40% of fare gates in BART's 50 stations.

  • Effectively prevented fare evasion attempts with enhanced security and durability.

202402 ABC 방송 내용.png

 

bart 승객사진.jpg

 

BART설치 스케줄 2024-10-23 101120.jpg